HeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 2m 3m

  • €5,99
    Unit price per 
Tax included. Shipping calculated at checkout.


Type C USB-C Data Charging Cable Fast Charger 

For Samsung Huawei Redmi One Plus



SHIPMENT:

Your order will be dispatched within 1 working day of receiving payment (Monday-Friday)

And you should expect to receive it one or two days after dispatch!

 

Fully fast charging is compatible with:

 

 Samsung Galaxy S10, S10 Plus, S8, S8+, S9 active S9+, Note 8, Note 9, and other devices supporting Type-C. 

The reversible connector works with any phone with a USB Type-C interface

Charging and Sync: 

 

Transfer speed up to 480Mb/s, 2.4A Fast Charger, Data Transfer, and Power Charging 2 in 1 USB-C Cable. 

This cable does support fast charging and we recommend using the original wall charger for your phone.
Compatible with QC2.0, QC3.0, USB-PD, and Adaptive Fast charging standards. 

(-fit Samsung galaxy s8 s9 s10 plus charger cable cord)

 

 

These cables have been constructed to meet Type C supported device standards. 

It's long enough to give you the distance from the charger but short enough for easy storage.

Its strong design can survive constant use while reducing stress, and wear or tear. 

The slim charging head works with nearly all phone cases.

About our product:

Our cable support Qualcomm QC 3.0, allowing the voltage of our cable to be 5V, the maximum output current is 3a. And data Syncing speeds up to 480MB/s, It also contained a 56K ohm resistor to protect your Device from high current danger and ensure safe charging.

Reversible connector:

This Type-C cable keeps up with the latest trend in USB interface. This user-friendly design allows you to plug into all your Type-C compatible devices without worrying about the orientation of the port.

 

Convenient length:

The length of the cable is 1m/2m/3m, so it's long enough to be convenient to charge your Device in the bedroom, sofa, or office, even when you are in the backseat of the car. Perfect replacements for your original cables with superior performance.

What you get: 

We provide 1M/2M/3M USB 2.0 Type C Cable with worry-free 

warranty and 24/7 customer service, if you have any questions, we will resolve your issue within 24 hours.


We Also Recommend